How Much Does an ADU Cost in Boise?
There's no single reliable number for what an ADU costs in Boise — it depends on which cost drivers apply to your property, and by how much. A number specific enough to be useful has to come from a builder pricing your actual site. Below are the real drivers a serious estimate is built from.
How the main paths compare
The pre-approved plan path is a permitting shortcut, not a structure type of its own — it applies to specific detached and above-garage designs. Plan availability doesn't mean your lot is eligible; see Boise ADU Rules for that.
Detached ADU
- Main advantage
- Most flexible site placement
- Common complexity
- Needs its own full foundation, roof, and structure
- Budget risk
- Highest cost per square foot
- Fits when
- No usable garage, or want it away from the house
Above-garage ADU
- Main advantage
- Reuses existing foundation, typically lower cost
- Common complexity
- Garage must structurally carry the added load
- Budget risk
- Structural upgrade cost if it can't
- Fits when
- Garage location and structure are up to it
Garage conversion
- Main advantage
- Usually the lowest-cost path
- Common complexity
- Bound by the garage's existing condition and footprint
- Budget risk
- Can't reduce the lot's required parking
- Fits when
- The garage doesn't need to stay a garage
Pre-approved plan path
- Main advantage
- Skips design review — free, no design fee
- Common complexity
- Limited to the plan set's fixed sizes and layouts
- Budget risk
- Any modification brings design costs back
- Fits when
- A standard size fits your site and needs
What moves the budget most
Usually the biggest swings
Structure type (detached vs. above-garage vs. conversion), utility extensions, size
Often significant
Site access, foundations and sitework, finish level
Real, but typically smaller
Design, engineering, and permitting path; demolition and existing conditions
This is a qualitative grouping based on how these drivers behave in practice, not measured percentages — see the sections below for what each one actually involves.
Detached vs. above-garage
A detached ADU needs its own full foundation, roof, and structure — the most expensive path per square foot, but the most flexible for site placement. Building above an existing garage reuses its foundation and typically costs less, but only if that garage can structurally carry the extra load.
Size
Cost per square foot drops as size increases, since a kitchen, bathroom, and utility hookups cost about the same whether the unit is 400 or 900 sq ft. Boise's 900 sq ft cap (see Boise ADU Rules) sets the ceiling; several of the city's free pre-approved plans are smaller than that.
The Goldfinch
The Waxwing
The Osprey
The Sandpiper
The Kingfisher
The Kestrel
City of Boise's current pre-approved ADU plans. Two additional mirrored variants are listed as coming soon with no published size yet. Being pre-approved covers the design itself, not whether a specific lot is eligible to build it.
Site access
A site your crew can reach easily costs less to build on than one needing hand-carried materials or a narrow path around existing structures. Access affects labor cost directly, separate from the ADU's size or finish level.
Utility extensions
A detached ADU usually needs its own electrical sub-panel and a new or upsized sewer/water connection. Distance from existing utility stub-outs, and whether there's spare capacity at all, can matter more than the structure itself.
Foundations
Soil conditions, slope, and frost depth all affect foundation cost — and a detached ADU carries this cost in full, since there's no existing foundation to build on like an above-garage unit has.
Finishes
Cabinetry, flooring, fixtures, and appliance grade swing cost meaningfully within the same footprint. A rental-grade package and a finish level matching the primary home are genuinely different budgets for the same floor plan.
Design and engineering
A pre-approved Boise ADU plan — free, no design fee — skips custom design and engineering for a qualifying project. A custom design, or any change to a pre-approved plan, brings those costs back.
Permitting
Beyond permit and impact fees, the review timeline itself carries real cost. A pre-approved plan generally moves faster through planning review than a custom design — which matters if financing or a rental timeline depends on it.
Demolition and sitework
Removing an existing structure, tree, or paved surface — or regrading for drainage — is real cost a per-square-foot estimate doesn't capture.
Existing garage conversion vs. new construction
Converting an existing garage is usually the lowest-cost path, since the shell, roof, and foundation already exist — but it can't reduce the lot's required parking (see Boise ADU Rules), and it's bound by the garage's actual condition. New construction costs more but isn't limited by an existing structure's footprint or location.
Every driver above depends on the specific property. A construction budget built before those are confirmed is a guess dressed up as a number. Feasibility comes first.
Next step
Check your property before you budget
A free preliminary report on zoning, parcel geometry, and site conditions — the facts a real cost estimate should be built on.
Check your property with ParceptIf your property looks feasible, Fortis Building Co. — the Boise-based builder and developer behind Parcept — can be the execution path. Talk to Fortis about design and build after feasibility is confirmed.